As per the approval of competent authority, it is proposed to switch over the entire DoP operations from DC to the Disaster Recovery Centre(DRC) from 12.12.2022. Stay Connected With Us For All New Latest Updates Through Our Telegram Channel 👇 https://t.me/DOP_Techshala This switch over activity will start from 03-00 AM on 11-12-2022 and is likely to be completed latest by 06-00 AM on 12-12-2022. Therefore, CSI/CBS/McCamish solutions will not be available for operations during this period. As and when individual systems/solutions are switched over and tested, the same will be made available for Business Operations, even before the above deadline. It is also proposed that post switch over, entire operations will run from the DRC Servers for a longer period of time. As a pre-requisite, it is mandatory to replace the existing SAP Logon File with the new one in all the systems connecting to any SAP Solution (Such as IPVS/DPMS/HRMS/F&A etc). The process of replace