Stay Connected with Us Join Our Telegram Updates
As per the approval of competent authority, it is proposed to switch over the entire DoP operations from DC to the Disaster Recovery Centre(DRC) fro…
Good Evening All,  SAP ECP system will be unavailable from 5:15 PM to 8:15 PM  TODAY DUE TO URGENT MAINTENANCE. Please plan your work accordingly. …
There Will Be An Approved Maintenance Window Of SAP ECP and CRM at DC From 0600 hrs of 15th Aug 2021 To 0600 hrs of 16th Aug 2021 For DR …
Respected Sir/Madam,   There will be an approved maintenance window of CSI,FSI and RSI applications at DC ( Data Center ) from 3 AM to 10…
Respected Sir/Madam, There will be an approved maintenance window of SAP ECP database at DC from 0900 Hrs to 1700 Hrs on 26-01-2020…